Yearly inspections and tests, a five-year load test, a door-lock retrofit that was due in 2020, and a brake requirement due January 1, 2027. Here is what DOB's documents say.

DOB says elevators must be inspected and tested twice a year, and 1 RCNY §103-02 sets the filing deadlines and penalties. Two retrofit dates sit on top of that schedule. Door-lock monitoring was due January 1, 2020. Existing traction elevators with single-plunger brakes must comply by January 1, 2027, under DOB's July 29, 2026 final reminder. That date is now less than two months away.

The mandate.

Periodic inspection: An annual visual inspection between January 1 and December 31, performed by an approved elevator agency on the owner's behalf. DOB says that agency "cannot be affiliated with the agency performing maintenance on the device." It must be at least three months from any CAT1 test or previous periodic inspection, and the report is due within 14 days.

Category 1 (CAT1) test: An annual no-load safety test between January 1 and December 31. The report is due within 21 days of the test, and DOB says filings not submitted by January 21 of the following year will not be accepted and failure-to-file violations will be issued.

Category 5 (CAT5) test: Performed within five years of the month of the most recent CAT5 test. For a new elevator, DOB describes it as a test with rated load and speed every five years from the month its Certificate of Compliance was issued. The report is due within 21 days of the test. DOB says category testing is performed and witnessed by approved independent third-party agencies and that owners are responsible for hiring the agency.

Defects: The rule requires correction within 90 days, except hazardous conditions and certain firefighter-operation defects, which must be corrected immediately. An affirmation of correction is due within 14 days of the correction. DOB's notice on Local Law 126 of 2021 says owners may request up to two 45-day extensions.

Door-lock monitoring (compliance date January 1, 2020, now past): DOB's 2019 presentation describes Section 3.10.12 as a "system to monitor and prevent automatic operation of passenger and freight elevators with faulty door contact circuits." It says all automatic passenger and freight elevators must comply and that a permit is always required.

Single-plunger brakes (compliance date January 1, 2027): DOB's notice gives owners of existing traction elevators with single-plunger brakes two paths: alter the assembly to dual-plunger type, or comply with Unintended Car Movement Protection under Section 2.19.2 of ASME A17.1-2013. An approved Elevator Agency Director or Co-Director files in DOB NOW: Build. The performing agency, the witnessing agency and the owner all sign off there. Our brake deadline post covers the steps in detail.

What DOB charges for missed filings.

These are the per-elevator penalties in 1 RCNY §103-02(i) for buildings with more than two residential units. DOB's brake notice states no penalty for missing the January 2027 date, so ask DOB or a consultant where a building stands if the work will not be finished.

Item Late Not filed
CAT1 or periodic inspection report$150 a month, up to $1,800$3,000
CAT5 report$250 a month, up to $3,000$5,000
Affirmation of correction$150 a month, up to $1,800$3,000

What published estimates say it costs.

These are per-elevator figures from Habitat, and they are several years old. We found no public price data we could rely on for routine tests or maintenance contracts, so get bids on a defined scope.

Work Published estimate Source
Door-lock monitoring upgradeUp to about $20,000Habitat, 2021 and 2018
Rope gripper$25,000 to $30,000Habitat, 2018
Double-plunger brake or rope gripperAbout $30,000Habitat, 2021
Full modernizationAs high as $300,000 or moreHabitat, 2021

Who gets paid.

  • The maintenance company: DOB says owners must have a current maintenance contract with an approved elevator agency.
  • A separate inspection agency: The periodic inspection agency cannot be affiliated with the maintenance agency.
  • A testing and witnessing agency: Category tests can mean more than one agency's fee. Where the code's table requires a witnessing agency, its director must sign the report.
  • The city: Filing fees and the penalties above.
  • The managing agent, if the contract says so: Agents may coordinate this work. We found no license specific to condo and co-op managing agents. Ask your board what, if anything, the agent charges on an elevator project.

The safety benefit, in our view, is real.

Habitat reported in 2018 that the door-lock and brake rules followed the death of Suzanne Hart in a Madison Avenue elevator and later fatal accidents. We think the safety case for these rules is sound. We use the word "extraction" elsewhere on this site for the costs that build up around mandates like these. That word is our opinion, and it is about how little a board can see of the price, not about whether the inspection is needed.

Questions worth asking, in our view.

  • Is the equipment proprietary? Habitat has advised boards to avoid "elevator systems that require proprietary equipment," saying non-proprietary elevators can be repaired by any properly trained technician using interchangeable parts. Ask before any modernization.
  • Who is recommending the scope? A building's service company is an obvious bidder for retrofit or modernization work and has a financial interest in what it recommends. An independent consultant can confirm brake types and scope.
  • What does the service contract exclude? Read the exclusions and the term, and ask when the contract was last rebid.

How to check your building's status.

  • DOB NOW: DOB's elevator FAQ points owners to DOB NOW: Safety for elevator filings and violations. Brake permits are in DOB NOW: Build, and DOB says it will not issue a Certificate of Compliance for that work, so ask for the filing and sign-off.
  • Ask your managing agent for the current service contract, the most recent CAT1 and CAT5 reports, door-lock monitoring confirmation, whether any car has a single-plunger brake, and any open violations.
  • Red flag, in our view: no one can say whether a traction elevator has a single-plunger brake with the January 1, 2027 date this close.

What to do before you buy.

  • Confirm door-lock monitoring is complete and whether any brake work is required, filed or signed off
  • Ask for the current service contract and review exclusions
  • Ask whether any modernization is planned and how it would be paid for
  • Ask whether any cease-use violations have been issued

The bottom line.

The tests and filing deadlines are set out in DOB's rule, and the penalties for missing them are specific. Traction elevators with single-plunger brakes must comply by January 1, 2027, so a board that has not checked its elevators should do so now.

In our view, the safety laws are defensible and the procurement around them deserves more scrutiny. We would like to see open access to diagnostic tools and parts where functionally identical, published price benchmarks, and competitive bidding on large elevator contracts. Until then, we think boards should rebid service contracts regularly and ask about proprietary equipment before signing a modernization.

Correction: An earlier version of this article said four firms control nearly all city elevator service and gave cost ranges and penalties, including a $5,000 daily charge, that we could not source. It also said brake work is filed in DOB NOW: Safety; DOB says DOB NOW: Build. The article was corrected on November 5, 2026.

Primary sources: DOB Elevator Compliance · DOB Elevators (owners) · DOB Elevator FAQs · 1 RCNY §103-02 · DOB final reminder on single-plunger brakes, July 29, 2026 · DOB 2019 presentation on door-lock monitoring and retroactive requirements · DOB notice on category testing, December 30, 2021.