DOB's proposed containment netting rule would have a representative of the building owner inspect the net daily.
The proposal covers the period before repairs begin. Companion to our post on Get Sheds Down.
The Department of Buildings has proposed a rule that would set conditions for using containment netting in place of a sidewalk shed in limited cases. DOB scheduled a public hearing for October 5, 2026, which was also the comment deadline. The proposal is new section 3307-02 of Title 1 of the Rules of the City of New York. As of November 11 the rule page still lists it as proposed, with comments closed, and we found no adopted version.
Where the rule comes from
Local Law 47 of 2025 added Building Code section 3307.6.2.1, which says the department "shall promulgate rules for the use of containment netting as an alternative to a sidewalk shed for areas with no public access or for use on a building exposure adjoining the exposure where façade work is to occur" (Local Law 47 of 2025). The proposed rule is DOB's answer to that instruction. It is not DOB's first word on netting: Buildings Bulletin 2023-006, issued July 25, 2023, said it "clarifies the procedure to obtain approval from the Department" for the use of "containment netting as an alternative to sidewalk sheds," treating netting as an alternative material under Administrative Code section 28-113 (Buildings Bulletin 2023-006). DOB's notice describes it as "a new rule regarding netting to be used in place of sidewalk sheds in certain circumstances" (proposed rule notice).
What the netting could be used for
Subdivision (b) of the proposed text says containment netting "may be used as an alternative to pedestrian protection or adjoining property protection for the temporary containment of unsafe or deteriorating façade conditions prior to the commencement of work to repair the façade." In plain terms, the proposal covers the period before repairs begin. It does not describe netting as a way to skip the shed while the repair is under way.
Subdivision (d) says so directly: "During the duration of façade work, pedestrian protection must be in place in accordance with Section 3307 of the Building Code," and that protection must be in place "prior to the commencement of façade work and before the containment netting is removed." Subdivision (m) adds that when netting is used during construction, alteration or demolition work, including façade work, it "will not be considered as an alternative to code required pedestrian protection."
What a building would have to line up
The proposal sets conditions that a board or its engineer would have to meet before any net goes up:
- A temporary construction installation permit under Administrative Code section 28-105.2 before installation (subdivision (f)).
- Construction documents "prepared by a New York State registered design professional" and specific to the site (subdivision (g)).
- A named make and model accepted by that professional, with the note that generic approvals of "or equivalent" are not authorized (subdivision (h)).
- A manufacturer's certificate of compliance, submitted to DOB before the installation permit is approved (subdivision (i)).
- Dual-layer construction, with structural netting lined with debris netting, and a minimum rated capacity of 6,000 lbs of lateral force over a 10-foot by 10-foot area (subdivision (e)).
During installation or removal, and as warranted during repairs, maintenance or adjustments, the areas beneath the netting must be closed to the public or protected by a shed, equivalent overhead protection or adjoining property protection (subdivision (c)).
The inspection duties that land on the owner
Subdivision (k) is where a building's own people appear in the text. It says "Containment netting must be inspected daily by a representative of the building owner, as well as prior to and subsequent to inclement weather events." When debris has fallen into the net, "the building owner must make arrangements with the permit holder to have the permit holder promptly clear the debris." Defects the owner or its authorized representative identifies "must be brought to the immediate attention of the permit holder."
A qualified person designated by the permit holder must also inspect the system after installation, after any repair, maintenance or adjustment, and periodically at six-month intervals, and the results go into a signed, dated report kept on site (subdivision (k)). The notice does not say who in a co-op or condo would be the owner's representative for the daily check. It does not say what the daily check must record either. The rule text leaves both open. The 2023 bulletin's maintenance section called for netting and hardware to be "inspected periodically by a competent person"; the daily check by the owner's representative appears in the proposed rule.
What the rule does not settle
The Mayor's Office of Operations certification attached to the proposal says the rule "Does not provide a cure period because it does not establish a violation, modification of a violation, or modification of the penalties associated with a violation." Any penalty for a lapse would therefore have to come from elsewhere in the code, and the notice does not identify one.
The one online comment on the rule page, from a licensed engineer writing in an individual capacity, raised several drafting questions. One was whether subdivision (b) is meant to be limited to the two situations Local Law 47 names. Another was that the rule sets no maximum time netting may stay up before repair begins (comment on the rule page). We have not seen a DOB response. The agency may change the text before adoption.
Bottom line.
Nothing in this proposal is in force. If DOB adopts it as written, netting would be a stopgap for a deteriorating facade before repair work starts, and the shed would still be required once that work begins. A board that has a facade condition should ask its engineer whether netting is an option, who would make the daily inspection if the rule is adopted, and how long the net would stay up. Our explainer on Local Law 11 covers the underlying facade cycle.
Primary sources: DOB proposed rule notice and text (2026 RG 031 / DOB-215); NYC Rules page for Containment Netting; Local Law 47 of 2025; DOB Buildings Bulletin 2023-006; NYC Rules adopted-rules list.
Companion resources: What is Local Law 11?; Get Sheds Down and the FISP changes; The NYC local-law extraction stack.